EPC

Manage construction and commissioning with efficiency and control.

For those who build and commission the plant: CADENCE, VAULT and CORTEX coordinate the site, as-built data and documentation in one shared environment. Design, construction and commissioning work on the same data, and what gets built matches what gets handed over.

1 DATA ENVIRONMENT FOR ALL CONTRACTORS−50% REWORK FROM MISALIGNMENTsettimane NOT MONTHS FOR THE HANDOVER PACKAGEADVISORY MODE · READ-ONLY1 DATA ENVIRONMENT FOR ALL CONTRACTORS−50% REWORK FROM MISALIGNMENTsettimane NOT MONTHS FOR THE HANDOVER PACKAGEADVISORY MODE · READ-ONLY
01In figuresFIELD DATA
1
data environment for all contractors
−50%
rework from misalignment
settimane
not months for the handover package
02The problem

The site builds from one version, the documentation says another.

A nuclear site runs dozens of contractors, thousands of drawings and constant revisions: without a common data environment, everyone works from their own copy and rework multiplies. At handover, aligning the as-built to the regulator's required documentation is a project of its own, expensive and exposed to findings.

03What it does04
01

Common data environment

CADENCE puts drawings, models and work orders in one shared, versioned space: every contractor works from the same revision, with changes tracked.

02

Live as-built

The real state of the site updates as it is built, so the gap between design and reality is always visible, not discovered at the end.

03

Handover documentation ready

CORTEX assembles and verifies the regulator's required documentation from site data, cutting the handover package from months to weeks.

04

Handover to operations

VAULT receives as-built, certificates and design bases as a lifecycle archive, so the operator starts with a complete plant memory.

04How it works04 STEPS
01

Share

Drawings and work orders enter the common CADENCE environment.

02

Build

Contractors work from the same revision, with a live as-built.

03

Compile

CORTEX generates and verifies the handover package from the data.

04

Hand over

VAULT archives the as-built and hands the plant to operations.

05Architecture

Three products for a site aligned from first excavation to handover: CADENCE provides the common data environment, CORTEX assembles the handover documentation from real data, VAULT receives the as-built as plant memory for operations.

01CADENCE: common data environmentDrawings, models and work orders in one versioned space: every contractor works from the same revision, with the as-built updating as it is built.
02CORTEX: handover packageAssembles and verifies the regulator's required documentation from site data, cutting the handover package from months to weeks.
03VAULT: handover to operationsReceives as-built, certificates and design bases as a lifecycle archive, so the operator starts with a complete plant memory.
06Deployment

Federated site environment

Each contractor keeps its own systems but publishes into the common CADENCE environment, so approved revisions change for everyone at the same moment without forced migrations.

On-site edge with CORE

CORE nodes bring the data environment to the site where connectivity is unstable, keeping the as-built accessible and synchronized even in areas without reliable network.

Owner on-prem

For projects where the owner requires site data and as-built to stay within their own infrastructure, with VAULT ready to receive the plant at handover.

07Security & compliance

Per-contractor perimeters

Each company sees only the data in its own scope, with boundaries between disciplines and contracts enforced by the system: collaboration happens without exposing confidential commercial information.

Revision control

Only approved revisions are buildable on site, with changes tracked and superseded revisions locked out: the risk of building from an obsolete version is removed.

Regulator-conformant handover

CORTEX verifies the handover package against the authority's requirements before transfer, so the alignment between as-built and documentation leaves no open findings.

08Integrations
CADENCE: construction common-data-environmentVAULT: plant-lifecycle archiveCORTEX: compliance and doc-control engineBIM and 4D models (IFC)Scheduling and site-management systems (Primavera P6)
09FAQ

Does every contractor have to change its tools?

No. CADENCE federates data from designers, EPCs and suppliers through standard exchange formats (IFC, BCF, ISO 19650) and connectors to scheduling tools like Primavera P6. Contractors keep their own systems and share into the common environment.

How is rework from superseded revisions cut?

All partners read the same approved revision: when it changes, it changes for everyone at once and the prior version is locked. No one builds from a disconnected copy anymore, the most common cause of nonconformities discovered after the fact.

Why does the handover package take weeks instead of months?

Because the regulator's required documentation is assembled from live site data as the plant is built, not reconstructed by hand at the end. CORTEX generates and verifies the package from data already present in the common environment.

What does the operator receive at handover?

VAULT receives as-built, certificates and design bases as a certified lifecycle archive. The operator starts with a complete, queryable plant memory rather than boxes of documents to reorganize.

10The markGRID 64 · STROKE 5

The mark encodes the mechanism, not the sector: la cupola di contenimento, il nucleo, le barre di controllo.

44302216
11Other products · ZEKLAR Energy

ZEKLAR software technology 4.0/5.0

Let's talk
ZEKLAR · SOFTWARE THAT MAKES THE DIFFERENCE.
ZEKLAR · VAT L81419031T · info@zeklar.com© 2026