ZEKLAR
EN / IT
03Trust

We never write
a set-point.

Advisory mode, read-only. The platform recommends; the operator decides. No automatic control loop on a critical asset.

1,008 MW · COMPLEJO MANTARO13% OF PERU'S ENERGY750,000 T/YEAR · SIDERPERU22 MODULES7 VERTICALSADVISORY MODE · READ-ONLYIEC 62443 · ISA-1011,008 MW · COMPLEJO MANTARO13% OF PERU'S ENERGY750,000 T/YEAR · SIDERPERU22 MODULES7 VERTICALSADVISORY MODE · READ-ONLYIEC 62443 · ISA-101
01OT / IT posture
01

Segregation

Purdue model with an industrial demilitarized zone between OT and IT.

02

Encryption and access

Encryption in transit and at rest, role-based access control, full audit log.

03

No disruption

Integration without interrupting operations: the plant keeps running as it does today.

04

Traceability

Every prediction traces back to the measured datum that produced it. The language model explains, it does not generate figures.

IEC 62443ISA-101ISO 20816ISO 13373API 670IEC 60034-27IEC 60270IEC 61508

ZEKLAR software technology 4.0/5.0

Let's talk